| Autodesk AutoCAD Civil 3D | Maintain | 12,074 | $92,500 |
| Land Development | Not rated | 9,479 | $102,500 |
| Traffic Signage | Not rated | 9,126 | $57,500 |
| Site Development | Maintain | 8,481 | $92,500 |
| Landscape Architecture | Not rated | 6,986 | $82,500 |
| Infrastructure Design | Not rated | 5,872 | $152,500 |
| Urban Planning | Invest | 5,448 | $97,500 |
| Infrastructure Automation | Invest | 5,353 | $167,500 |
| Infrastructure Development | Not rated | 4,658 | $152,500 |
| Transportation Planning | Not rated | 4,522 | $112,500 |
| Traffic Engineering | Maintain | 4,428 | $112,500 |
| Transportation Engineering | Maintain | 4,096 | $112,500 |
| Transport Infrastructure | Not rated | 4,002 | $117,500 |
| Landscape Design | Not rated | 3,611 | $52,500 |
| Signal Systems | Maintain | 2,727 | $102,500 |
| Infrastructure Planning | Not rated | 2,593 | $117,500 |
| City Design | Not rated | 2,099 | $87,500 |
| Site Planning | Not rated | 1,983 | $107,500 |
| Roadway Design | Maintain | 1,942 | $117,500 |
| Site Analysis | Maintain | 1,905 | $42,500 |
| OpenRoads Designer | Maintain | 1,860 | $102,500 |
| Urban Development | Not rated | 1,769 | $82,500 |
| Transportation Design | Not rated | 1,458 | $102,500 |
| Land Use Planning | Not rated | 1,216 | $97,500 |
| Rail Track Maintenance | Maintain | 1,096 | $57,500 |
| Shared Mobility Integration | Invest | 1,079 | $197,500 |
| Traffic Congestion Analysis | Maintain | 1,076 | $62,500 |
| Traffic Studies | Not rated | 1,044 | $102,500 |
| Urbanization | Not rated | 1,019 | $97,500 |
| Highway Design | Maintain | 994 | $102,500 |
| Bentley InRoads Suite | Migrate | 891 | $107,500 |
| Public Transit Management | Maintain | 838 | $107,500 |
| Municipal Engineering | Maintain | 833 | $102,500 |
| Urban Management | Not rated | 732 | $102,500 |
| Signal Timing | Invest | 707 | $92,500 |
| Permitting and zoning regulations | Maintain | 685 | $97,500 |
| Streetcar System | Monitor | 679 | $107,500 |
| Planning and Zoning | Maintain | 675 | $92,500 |
| High-Speed Rail Construction | Invest | 471 | $167,500 |
| Urban Mobility | Invest | 469 | $92,500 |
| Trafficware SimTraffic | Maintain | 467 | $82,500 |
| Route Efficiency | Maintain | 460 | $52,500 |
| Spatial Planning | Maintain | 435 | $92,500 |
| Traffic Congestion Management | Invest | 435 | $197,500 |
| Outdoor Living | Not rated | 420 | $72,500 |
| Road Design | Maintain | 396 | $132,500 |
| Neighborhood Development | Not rated | 395 | $92,500 |
| Pavement Design | Maintain | 391 | $107,500 |
| Public Transit Planning | Invest | 385 | $107,500 |
| Traffic Management Planning | Maintain | 313 | $107,500 |
| Transoft Solutions AutoTURN | Maintain | 302 | $112,500 |
| Public Transportation Infrastructure | Maintain | 263 | $127,500 |
| Urban Renewal | Not rated | 254 | $97,500 |
| Transport Modeling | Invest | 208 | $127,500 |
| Land Assessment | Maintain | 169 | — |
| Transportation Demand Forecasting | Invest | 160 | $82,500 |
| Eagle Point Site Design | Migrate | 149 | $42,500 |
| Signal Control | Invest | 145 | $82,500 |
| Line Striping | Not rated | 144 | $42,500 |
| Land Use Management | Invest | 138 | $87,500 |
| Pothole Patching | Maintain | 136 | $57,500 |
| Bentley GEOPAK Civil Engineering Suite | Migrate | 118 | $127,500 |
| Cultural Landscapes | Not rated | 116 | $57,500 |
| Shoreline Protection | Invest | 110 | $62,500 |
| openBIM Data Interoperability | Invest | 110 | $182,500 |
| Transportation Modeling | Invest | 105 | $97,500 |
| Traffic Signal Optimization | Invest | 101 | $82,500 |
| Transit Priority Systems | Invest | 101 | — |
| McTrans Center TSIS-CORSIM | Maintain | 93 | — |
| Forest Engineering | Maintain | 85 | $37,500 |
| Urban Resilience | Not rated | 80 | $107,500 |
| Landscaping Design | Maintain | 74 | $37,500 |
| Traditional Building Techniques | Not rated | 72 | $32,500 |
| Infrastructure Assessment | Invest | 71 | $102,500 |
| Traffic Forecasting | Invest | 71 | $102,500 |
| Urban Green Space Planning | Invest | 68 | $97,500 |
| Crime Prevention Through Environmental Design | Maintain | 66 | $97,500 |
| Smart City Technologies | Invest | 66 | — |
| Cycling Infrastructure Management | Invest | 63 | $132,500 |
| Accessibility Planning | Maintain | 52 | $132,500 |
| Coastal Erosion Management | Invest | 52 | $67,500 |
| Pathway Design | Maintain | 52 | $182,500 |
| Transport Network Design | Maintain | 48 | — |
| Sustainable Landscape Design | Invest | 47 | $77,500 |
| Adaptive Traffic Signal Control | Invest | 45 | $107,500 |
| Battlefield Preparation | Not rated | 43 | — |
| Transport Engineering | Maintain | 43 | $112,500 |
| Urban Garden Design | Invest | 40 | $52,500 |
| Road Safety Design | Invest | 37 | — |
| Parking Facilities | Not rated | 36 | $47,500 |
| Traffic Calming Installation | Maintain | 34 | — |
| Autodesk AutoCAD Land Desktop | Migrate | 32 | $67,500 |
| Smart Transportation Systems | Invest | 32 | $147,500 |
| Urban Parking Design | Maintain | 30 | $117,500 |
| Window Design | Maintain | 26 | — |
| Shoreline Management | Invest | 25 | — |
| Texas Transportation Institute TTI Progression Analysis and Signal System Evaluation Routine (PASSER) | Maintain | 23 | — |
| PTV Vissim | Maintain | 20 | — |
| Subway System Construction | Invest | 20 | — |
| Sports Field Design | Maintain | 15 | — |
| Bike Lane Network Design | Invest | 13 | — |
| Coastal Sediment Management | Maintain | 13 | — |
| Biophilic Design Implementation | Invest | 12 | — |
| Connected and Autonomous Vehicle Infrastructure Design | Invest | 11 | — |
| Aimsun | Maintain | 10 | — |
| Greenhouse Construction | Maintain | 10 | $32,500 |
| Light Rail Construction | Invest | 9 | — |
| Treehouse Engineering | Monitor | 8 | — |
| Electric Vehicle Charging Infrastructure Planning | Invest | 6 | $102,500 |
| Sustainable Urban Design | Not rated | 6 | — |
| Autodesk CAiCE Visual Transportation | Migrate | 5 | — |
| Quadstone Paramics | Maintain | 5 | — |
| Smart City Infrastructure Design | Invest | 5 | — |
| Living Shoreline Design | Invest | 3 | — |
| Personal Rapid Transit | Monitor | 3 | — |
| Roundabout Delay (RODEL) | Maintain | 3 | — |
| Smart Traffic Management Systems | Invest | 3 | — |
| Traffic shapers | Maintain | 3 | — |
| Urban Analysis | Invest | 3 | — |
| Highway Design Optimization | Maintain | 2 | — |
| SEDCAD | Maintain | 2 | — |
| Urban Infrastructure Planning | Invest | 2 | — |
| Clark Labs IDRISI | Migrate | 1 | — |
| Reconstruction / Rehabilitation | Maintain | 1 | — |
| Road Network Analysis | Invest | 1 | — |
| Smart City Planning | Not rated | 1 | — |
| Smart Transit Systems | Invest | 1 | — |
| 3D urban simulation modeling | Invest | — | — |
| A-T Solutions Easy Street Draw | Monitor | — | — |
| AI in Urban Planning | Invest | — | — |
| Advanced Urban Traffic Flow Design | Not rated | — | — |
| Automated Guideway Transit | Monitor | — | — |
| Automated Transport Hub Design | Monitor | — | — |
| Bentley CUBE | Maintain | — | — |
| Citilabs Cube | Monitor | — | — |
| Citilabs TRANPLAN | Migrate | — | — |
| Citizen-Centric Infrastructure Design | Invest | — | — |
| Clark Labs CartaLinx | Migrate | — | — |
| Construction Robotics Integration | Invest | — | — |
| CorridorDesigner | Monitor | — | — |
| Cyber-Physical Security for Infrastructure Control Systems | Invest | — | — |
| Dowling Associates TRAFFIX | Maintain | — | — |
| Eagle Point LANDCADD | Migrate | — | — |
| Highway Systems & Roadways | Not rated | — | — |
| Integrated Parking Solutions MApp | Monitor | — | — |
| Material Passport Documentation | Invest | — | — |
| McTrans TRANSYT-7F | Maintain | — | — |
| Neighborhood Sustainability Certification | Invest | — | — |
| Ramp Building | Maintain | — | — |
| Roadway Surfacing / Paving | Not rated | — | — |
| Smart City Resilience Planning | Invest | — | — |
| Smart Sustainable City Planning | Invest | — | — |
| Subsurface Rail Design | Maintain | — | — |
| TRL Software TRANSYT | Maintain | — | — |
| Trafficware SynchroGreen | Maintain | — | — |
| Urban Air Mobility Vertiport Design | Monitor | — | — |
| UrbanSim | Maintain | — | — |
| Vertical Farm Facility Design | Invest | — | — |