| Industrial Engineering | Maintain | 16,756 | $102,500 |
| Advanced Manufacturing | Invest | 9,419 | $92,500 |
| Production Methods | Not rated | 8,929 | $87,500 |
| Production Engineering | Maintain | 5,246 | $97,500 |
| Production Flow | Not rated | 5,128 | $42,500 |
| Industrial Technology | Maintain | 3,746 | $72,500 |
| System Efficiency | Not rated | 2,783 | $107,500 |
| Continuous Manufacturing | Maintain | 2,133 | $52,500 |
| Resource Optimization | Maintain | 2,125 | $132,500 |
| Production Technology | Maintain | 1,075 | $102,500 |
| Assembly line balancing software | Invest | 870 | $107,500 |
| Time Study | Monitor | 801 | $67,500 |
| Layout Optimization | Maintain | 602 | $47,500 |
| Cycle Time Reduction | Maintain | 570 | $92,500 |
| Production Optimization | Not rated | 503 | $117,500 |
| Equipment Optimization | Not rated | 437 | $77,500 |
| Work Measurement | Maintain | 423 | $87,500 |
| Methods Engineering | Maintain | 303 | $87,500 |
| Visual Controls | Maintain | 298 | $87,500 |
| IQMS MES | Maintain | 265 | $47,500 |
| Production Capacity Optimization | Maintain | 219 | $142,500 |
| Artificial Intelligence for Manufacturing | Invest | 200 | $172,500 |
| Manufacturing Process Capacity | Not rated | 147 | $97,500 |
| GE Proficy | Maintain | 140 | — |
| Cycle Time Analysis | Maintain | 123 | $102,500 |
| Assembly Line Optimization | Invest | 87 | $37,500 |
| Advanced Process Planning | Not rated | 57 | $132,500 |
| Material Flow Analysis | Invest | 38 | — |
| Naval Vessel Maintenance | Maintain | 37 | — |
| Manufacturing Process Analysis | Not rated | 35 | $97,500 |
| Launch Vehicle Manufacturing Optimization | Invest | 31 | $122,500 |
| Production Process Flow | Not rated | 23 | — |
| Production Line Management | Not rated | 19 | $77,500 |
| Fabrication Optimization | Not rated | 18 | — |
| Time & Motion Study | Monitor | 15 | — |
| AspenTech Aspen InfoPlus | Maintain | 12 | — |
| Innovation in Transit | Not rated | 12 | — |
| Belt Analyst | Maintain | 6 | — |
| Workstation Analysis | Maintain | 6 | — |
| Material Process Optimization | Maintain | 5 | — |
| Matrix Production System Design | Invest | 1 | — |
| Reinforcement Learning for Production Scheduling | Invest | 1 | — |
| RungePincockMinarco XPAC | Maintain | 1 | — |
| ABB CPM4Metals | Maintain | — | — |
| Acoustic Emission Process Monitoring | Maintain | — | — |
| Assembly Line Problem | Maintain | — | — |
| Composable Modular Manufacturing Line Design | Invest | — | — |
| Computer Vision Process Mining on the Shop Floor | Invest | — | — |
| Fabrication Planning & Control | Not rated | — | — |
| Feed Mill Process Flow | Maintain | — | — |
| Foundry Cost Analysis | Maintain | — | — |
| Foundry Cost Breakdown | Maintain | — | — |
| Generative AI for Standard Operating Procedure Authoring | Invest | — | — |
| Gigafactory Production Ramp Engineering | Invest | — | — |
| HotFlo! Die-Shot Monitor | Monitor | — | — |
| Hyperspectral Imaging for Inline Inspection | Invest | — | — |
| Mine Product Flow | Not rated | — | — |
| NI Vision Builder for Automated Inspection | Maintain | — | — |
| Particle Size Control | Maintain | — | — |
| Prescriptive Maintenance Analytics | Invest | — | — |
| Production Flow Analysis and Simplification Toolkit (PFAST) | Monitor | — | — |
| Quantum-Inspired Production Optimization | Monitor | — | — |
| Sawmill Process Flow | Maintain | — | — |
| Self-Supervised Anomaly Detection for Quality | Invest | — | — |
| Sharetech Tabs Plus | Monitor | — | — |
| Steel Production Optimization | Invest | — | — |
| Workload Analysis Industrial Management | Maintain | — | — |